2 min readBlockingEIOPA taxonomy 2.10.0Updated 11 November 2026

Content of the submission and basic information: a conditional check (S.01.01, S.01.02, EIOPA rule BV342)

A blocking check on the content of the submission (S.01.01) and basic information (S.01.02) templates, in the annual solo (ARS), annual group (ARG) and annual branch (ARB) returns.

It applies to 2.8.2 returns too, the release for the 2026 returns, and Line4 Check runs it there as well.

The rule in plain words

If group uses transitional measure on technical provisions then template Impact of long-term guarantees measures and transitionals (S.22.01) has to be reported

The headline gives only the template and the kind of check, because the rule is too long to say in a headline. The plain words above say all of it.

EIOPA writes it out as separate checks, one for each table or return it covers. Line4 Check runs three of them (BV342-1 to BV342-5), and a failure names the one that failed.

What to do if your return fails it

  1. 01Open the tables below and find the cells the rule reads.
  2. 02The check applies only when its first part holds in your return. When it does, the second part must hold too: fix the second part, or correct the first.
  3. 03It runs only when your filing indicators mark S.01.01 and S.01.02 as reported.
  4. 04This is a blocking check. A return that fails it is normally rejected, so fix it before you submit.

The cells it reads

Content of the submission (S.01.01.01.01)

Row

  • R0370S.22.01.01 - Impact of long-term guarantees measures and transitionals

Column

  • C0010Reporting status

Content of the submission (S.01.01.04.01)

Row

  • R0370S.22.01.04 - Impact of long-term guarantees measures and transitionals

Column

  • C0010Reporting status

Content of the submission (S.01.01.07.01)

Row

  • R0370S.22.01.01 - Impact of long-term guarantees measures and transitionals

Column

  • C0010Reporting status

Basic information (S.01.02.01.01)

Row

  • R0200Transitional measure on technical provisions

Column

  • C0010Report information

Basic information (S.01.02.04.01)

Row

  • R0200Transitional measure on technical provisions

Column

  • C0010Report information

Basic information (S.01.02.07.01)

Row

  • R0200Transitional measure on technical provisions

Column

  • C0010Report information

Which returns it applies to

Line4 Check runs it on annual solo (ARS), annual group (ARG) and annual branch (ARB) returns on EIOPA taxonomy 2.10.0. EIOPA applies it to annual group (ARG), annual branch (ARB) and annual solo (ARS) returns, as a blocking check.

EIOPA’s own words and formula

In EIOPA’s list of validations, word for word:

If group uses transitional measure on technical provisions then template S.22.01 - Impact of long-term guarantees measures and transitionals has to be reported.
Show the formulaShow

EIOPA's formula, for BV342-5. Cells are written as {t: table, r: row, c: column}.

if ({t: S.01.02.01.01, r: R0200, c: C0010} = [s2c_AP:x11]) then {t: S.01.01.01.01, r: R0370, c: C0010} = [s2c_CN:x1] else true()

BV342-1:

if ({t: S.01.02.04.01, r: R0200, c: C0010} = [s2c_AP:x11]) then {t: S.01.01.04.01, r: R0370, c: C0010} = [s2c_CN:x1] else true()

BV342-3:

if ({t: S.01.02.07.01, r: R0200, c: C0010} = [s2c_AP:x11]) then {t: S.01.01.07.01, r: R0370, c: C0010} = [s2c_CN:x1] else true()

Every Solvency II rule on S.01.01

Checks like this one, run at the point of submission, are the first step to real-time supervision. Line4 builds SupTech software for financial regulators that runs checks like these as each return arrives.