The rule in plain words
The total unconstrained expected shortfall for the previous day
In row "Total positions" (0010) of Market risk: internal model approach 1A (MKR IMA1A) (OF24.01.01.01): if "ES (R,C)" (column 0110) is not zero, "Total" (column 0130) must equal "ES (R,S)" (column 0120) multiplied by the larger of "ES (F,C)" (column 0100) divided by "ES (R,C)" (column 0110) and 1.
What to do if your return fails it
- 01Open the table below and find the cells the rule reads.
- 02The check applies only when its first part holds in your return. When it does, the second part must hold too: fix the second part, or correct the first.
- 03The Bank of England allows a small rounding difference, worked out from the decimals each value is reported with.
- 04It runs only when your filing indicators mark OF24.01.01 as reported.
- 05This is a blocking check. A return that fails it is normally rejected, so fix it before you submit.
The cells it reads
Market risk: internal model approach 1A (MKR IMA1A) (OF24.01.01.01)
Row
- R0010Total positions
Columns
- C0100ES (F,C)
- C0110ES (R,C)
- C0120ES (R,S)
- C0130Total
Which returns it applies to
Line4 Check runs it on the own funds (PRA001) return on Bank of England banking taxonomy 4.1.1. The Bank of England applies it to own funds (PRA001) returns, as a blocking check.
The Bank’s own words and formula
The first paragraph of the plain words above is the Bank of England’s own, word for word, from its list of validations. The second spells out its formula, with each cell named from its templates.
Show the formulaShowHide
The Bank of England's formula. Cells are written as {t: table, r: row, c: column}.
if ({t: OF24.01.01.01, r: 0010, c: 0110} != 0) then ({t: OF24.01.01.01, r: 0010, c: 0130} = {t: OF24.01.01.01, r: 0010, c: 0120} * max({t: OF24.01.01.01, r: 0010, c: 0100} / {t: OF24.01.01.01, r: 0010, c: 0110}, 1)) else (true())Other rules on Market risk: internal model approach 1A (MKR IMA1A) (OF24.01.01.01)
- Market risk: internal model approach 1A (MKR IMA1A): the total constrained expected shortfall over the previous 60 working days (boe_b0677)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the total unconstrained expected shortfall for the previous day (boe_b0679)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the total unconstrained expected shortfall over the previous 60 working days (boe_b0676)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the total expected shortfall for the previous day (boe_b0552)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the total expected shortfall over the previous 60 working days (boe_b0551)Blocking
- The start date used for the ES stress period calculation shall be earlier in time than the end date (boe_b0890)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): a value must not be more than another (boe_b0899)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): a value must not be more than another (boe_b0902)Blocking
Every PRA banking rule on OF24.01.01.01
Checks like this one, run at the point of submission, are the first step to real-time supervision. Line4 builds SupTech software for financial regulators that runs checks like these as each return arrives.
