The rule in plain words
The total expected shortfall over the previous 60 working days
In row "Total positions" (0010) of Market risk: internal model approach 1A (MKR IMA1A) (OF24.01.01.01): "Total" (column 0090) must equal "Total" (column 0040) multiplied by 0.5 plus "Total" (column 0080) multiplied by 0.5.
What to do if your return fails it
- 01Open the table below and find the cells the rule reads.
- 02Add up the parts in your return and compare the result with the total.
- 03If they differ, a part is missing, a value sits in the wrong cell, or the total is out of date.
- 04The Bank of England allows a small rounding difference, worked out from the decimals each value is reported with.
- 05It runs only when your filing indicators mark OF24.01.01 as reported.
- 06This is a blocking check. A return that fails it is normally rejected, so fix it before you submit.
The cells it reads
Market risk: internal model approach 1A (MKR IMA1A) (OF24.01.01.01)
Row
- R0010Total positions
Columns
- C0040Total
- C0080Total
- C0090Total
Which returns it applies to
Line4 Check runs it on the own funds (PRA001) return on Bank of England banking taxonomy 4.1.1. The Bank of England applies it to own funds (PRA001) returns, as a blocking check.
The Bank’s own words and formula
The first paragraph of the plain words above is the Bank of England’s own, word for word, from its list of validations. The second spells out its formula, with each cell named from its templates.
Show the formulaShowHide
The Bank of England's formula. Cells are written as {t: table, r: row, c: column}.
{t: OF24.01.01.01, r: 0010, c: 0090} = ({t: OF24.01.01.01, r: 0010, c: 0040} * 0.5) + ({t: OF24.01.01.01, r: 0010, c: 0080} * 0.5)Other rules on Market risk: internal model approach 1A (MKR IMA1A) (OF24.01.01.01)
- Market risk: internal model approach 1A (MKR IMA1A): the total expected shortfall for the previous day (boe_b0552)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): a conditional check (boe_b0429)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the expected shortfall measure for each risk factor (boe_b0427)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the total unconstrained expected shortfall over the previous 60 working days (boe_b0676)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the total constrained expected shortfall over the previous 60 working days (boe_b0677)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the total unconstrained expected shortfall for the previous day (boe_b0678)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the total unconstrained expected shortfall for the previous day (boe_b0679)Blocking
- Market risk: internal model approach 1A (MKR IMA1A): the constrained expected shortfall measure for the risk factor Foreign Exchange Risk (boe_b0364)Blocking
Every PRA banking rule on OF24.01.01.01
Checks like this one, run at the point of submission, are the first step to real-time supervision. Line4 builds SupTech software for financial regulators that runs checks like these as each return arrives.
