The rule in plain words
If Impact of long term guarantees measures and transitionals (IR.22.01) is reported then rows r0090 and r0110 have to be greater than 0
What to do if your return fails it
- 01Open the tables below and find the cells the rule reads.
- 02The check applies only when its first part holds in your return. When it does, the second part must hold too: fix the second part, or correct the first.
- 03It runs only when your filing indicators mark IR.01.01 and IR.22.01 as reported.
- 04This is a warning. It does not stop the return on its own, but your supervisor may ask you to explain it.
The cells it reads
Content of the submission (IR.01.01.01.01)
Row
- R0370IR.22.01.01 - Impact of long term guarantees measures and transitionals
Column
- C0010c
Impact of long term guarantees measures and transitionals (IR.22.01.01.01)
Rows
- R0090Solvency Capital Requirement
- R0110Minimum Capital Requirement
Columns
- C0010Amount with Long Term Guarantee measures and transitionals
- C0020Without transitional on technical provisions
- C0040Without transitional on interest rate
- C0060Without volatility adjustment and without other transitional measures
- C0080Without matching adjustment and without all the others
Own funds (IR.23.01.01.01)
Rows
- R0580SCR
- R0600MCR
Column
- C0010Total
Solvency capital requirement (IR.25.04.01.01)
Row
- R0480Solvency capital requirement including capital add-on
Column
- C0010c
Minimum capital requirement - only life or only non-life activity - overall MCR calculation (IR.28.01.01.05)
Row
- R0400Minimum Capital Requirement
Column
- C0070c
Minimum capital requirement - both life and non-life activity - overall MCR calculation (IR.28.02.01.05)
Row
- R0400Minimum Capital Requirement
Column
- C0130c
Which returns it applies to
Line4 Check runs it on annual solo (ARS) return on Bank of England taxonomy 2.2.0. The Bank of England applies it to annual solo (ARS) returns, as a warning.
The Bank’s own words and formula
In the Bank of England’s list of validations, word for word:
If IR.22.01 - Impact of long term guarantees measures and transitionals is reported then rows r0090 and r0110 have to be greater than 0.
Show the formulaShowHide
The Bank of England's formula. Cells are written as {t: table, r: row, c: column}.
if ({t: IR.01.01.01.01, r: R0370, c: C0010} = $[s2c_CN:x1]) then {t: IR.22.01.01.01, r: R0090, z: Z0001} > 0 and {t: IR.22.01.01.01, r: R0110, z: Z0001} > 0 else true()Other rules on Content of the submission (IR.01.01)
- If Impact of long term guarantees measures and transitionals is reported then rows r0010, r0020, r0050 and r0100 have to be different from 0 (IR_bv1734)
- Content of the submission and 2 other templates: a conditional check (IR_bv1736)
- Content of the submission and 4 other templates: a conditional check (IR_bv1741)
- Content of the submission and basic information - general: a conditional check (IR_bv1725)Blocking
- Content of the submission and basic information - general: a conditional check (IR_bv1746_01)Blocking
- Content of the submission and basic information - general: a conditional check (IR_bv1746_02)Blocking
- Content of the submission and basic information - general: a conditional check (IR_bv1749_01)
- Content of the submission and basic information - general: a conditional check (IR_bv1749_02)
Every Solvency UK rule on IR.01.01