1 min readWarningEBA reporting framework 4.2Updated 10 November 2026

Additional requirements for options (non-delta risks) must equal the sum of its five parts (C 21.00, EBA rule v903648_h)

A warning in the own funds and capital requirements return (COREP own funds), on template C 21.00, market risk: standardised approach for position risk in equities.

The rule in plain words

Additional requirements for options (non-delta risks) must equal these five added up:

  • Simplified method
  • Delta plus approach - additional requirements for gamma risk
  • Delta plus approach - additional requirements for vega risk
  • Delta plus approach - non-continuous options and warrants
  • Scenario matrix approach

All the values are in the own funds requirements column (0060) of C 21.00.

EBA checks it on 25 sheets, from total (0001) to euro area (0044). That makes 25 checks. A failure names the one that failed.

How the Line4 Check report words itShow

The first of its checks, word for word as the report shows it when it fails. The others read the same, with their own column, row or sheet.

Own funds requirements: Additional requirements for options (non-delta risks), Macedonia = Simplified method, Macedonia + Delta plus approach - additional requirements for gamma risk, Macedonia + Delta plus approach - additional requirements for vega risk, Macedonia + Delta plus approach - non-continuous options and warrants, Macedonia + Scenario matrix approach, Macedonia

What to do if your filing fails it

  1. 01Open the template below and find the cells the rule reads.
  2. 02Add up the parts in your file and compare the result with the total.
  3. 03If they differ, a part is missing, a value sits in the wrong row, or the total is out of date.
  4. 04EBA allows a small rounding difference, worked out from the decimals each value is reported with.
  5. 05It runs only when your filing indicators mark C 21.00 as reported.
  6. 06This is a warning. It does not stop the filing on its own, but your authority may ask you to explain it.

The cells it reads

Market risk: standardised approach for position risk in equities (C 21.00)

Rows

  • 0090Additional requirements for options (non-delta risks)
  • 0100Simplified method
  • 0110Delta plus approach - additional requirements for gamma risk
  • 0120Delta plus approach - additional requirements for vega risk
  • 0125Delta plus approach - non-continuous options and warrants
  • 0130Scenario matrix approach

Column

  • 0060Own funds requirements

Sheets

  • 0001Total
  • 0004Bulgaria
  • 0006Czech Republic
  • 0007Denmark
  • 0013Hungary
  • 0021Poland
  • 0023Romania
  • 0027Sweden
  • 0028United Kingdom
  • 0029Albania
  • 0030Japan
  • 0031Macedonia
  • 0032Russian Federation
  • 0033Serbia
  • 0034Switzerland
  • 0035Turkey
  • 0036Ukraine
  • 0037USA
  • 0038Norway
  • 0039Egypt
  • 0040Iceland
  • 0041Liechtenstein
  • 0042Other
  • 0043Croatia
  • 0044Euro Area

A worked example

The first of its checks, with simple numbers.

Illustrative values
Simplified method1,200
Delta plus approach - additional requirements for gamma risk800
Delta plus approach - additional requirements for vega risk450
Delta plus approach - non-continuous options and warrants300
Scenario matrix approach150
Together2,900
What the rule then expects

Additional requirements for options (non-delta risks) must then be 2,900.

2,900Passes
3,000Fails

A file that reports 2,900 passes. One that reports 3,000 fails, by 100.

The numbers are illustrative, reported to the unit, so the rounding tolerance does not change the result.

Show the rule as writtenShow

EBA's formula, as written out for the first of its checks. Cells are written as {template, row, column, sheet}.

{C_21.00,r0090,c0060,s0031} = {C_21.00,r0100,c0060,s0031} + {C_21.00,r0110,c0060,s0031} + {C_21.00,r0120,c0060,s0031} + {C_21.00,r0125,c0060,s0031} + {C_21.00,r0130,c0060,s0031}

The next five:

{C_21.00,r0090,c0060,s0037} = {C_21.00,r0100,c0060,s0037} + {C_21.00,r0110,c0060,s0037} + {C_21.00,r0120,c0060,s0037} + {C_21.00,r0125,c0060,s0037} + {C_21.00,r0130,c0060,s0037}{C_21.00,r0090,c0060,s0030} = {C_21.00,r0100,c0060,s0030} + {C_21.00,r0110,c0060,s0030} + {C_21.00,r0120,c0060,s0030} + {C_21.00,r0125,c0060,s0030} + {C_21.00,r0130,c0060,s0030}{C_21.00,r0090,c0060,s0013} = {C_21.00,r0100,c0060,s0013} + {C_21.00,r0110,c0060,s0013} + {C_21.00,r0120,c0060,s0013} + {C_21.00,r0125,c0060,s0013} + {C_21.00,r0130,c0060,s0013}{C_21.00,r0090,c0060,s0023} = {C_21.00,r0100,c0060,s0023} + {C_21.00,r0110,c0060,s0023} + {C_21.00,r0120,c0060,s0023} + {C_21.00,r0125,c0060,s0023} + {C_21.00,r0130,c0060,s0023}{C_21.00,r0090,c0060,s0043} = {C_21.00,r0100,c0060,s0043} + {C_21.00,r0110,c0060,s0043} + {C_21.00,r0120,c0060,s0043} + {C_21.00,r0125,c0060,s0043} + {C_21.00,r0130,c0060,s0043}

And 19 more, the same formula for the other cells it covers.

Every COREP own funds rule, by template

Checks like this one, run at the point of submission, are the first step to real-time supervision.