The rule in plain words
For credit facilities: to credit institutions must equal these three added up:
- Other
- For funding promotional loans of non-financial customers
- For funding promotional loans of retail customers
EBA checks it for two columns: amount and outflow. That makes two checks. A failure names the one that failed.
How the Line4 Check report words itShowHide
The first of its checks, word for word as the report shows it when it fails. The others read the same, with their own column, row or sheet.
Amount: to credit institutions = other + for funding promotional loans of non-financial customers + for funding promotional loans of retail customers
What to do if your filing fails it
- 01Open the template below and find the cells the rule reads.
- 02Add up the parts in your file and compare the result with the total.
- 03If they differ, a part is missing, a value sits in the wrong cell, or the total is out of date.
- 04EBA allows a small rounding difference, worked out from the decimals each value is reported with.
- 05It runs only when your filing indicators mark C 73.00 as reported.
- 06This is a warning. It does not stop the filing on its own, but your authority may ask you to explain it.
The cells it reads
Liquidity coverage, outflows, total (DA) (C 73.00.a)
Rows
- 0500to credit institutions
- 0510for funding promotional loans of retail customers
- 0520for funding promotional loans of non-financial customers
- 0530other
Columns
- 0010Amount
- 0060Outflow
A worked example
The first of its checks, with simple numbers.
To credit institutions must then be 2,450.
A file that reports 2,450 passes. One that reports 2,550 fails, by 100.
The numbers are illustrative, reported to the unit, so the rounding tolerance does not change the result.
Show the rule as writtenShowHide
EBA's formula, as written out for the first of its checks. Cells are written as {template, row, column, sheet}.
{C_73.00.a,r0500,c0010,} = sum({C_73.00.a,r0530,c0010,},{C_73.00.a,r0520,c0010,},{C_73.00.a,r0510,c0010,})The next one:
{C_73.00.a,r0500,c0060,} = sum({C_73.00.a,r0510,c0060,},{C_73.00.a,r0530,c0060,},{C_73.00.a,r0520,c0060,})Other rules on C 73.00.a
- Credit facilities must equal the sum of its seven parts (v4495_m)Warning
- Liquidity facilities must equal the sum of its eight parts (v4497_m)Warning
- Committed facilities must equal credit facilities plus liquidity facilities (v4494_m)Warning
- To SSPEs must equal the sum of its two parts (v4498_m)Warning
- Loss of funding on structured financing activites must equal the sum of its two parts (v4493_m)Warning
- Liquidity facilities: to credit institutions must equal the sum of its three parts (v4499_m)Warning
- Short positions must equal short positions covered by collateralized SFT plus other (v4492_m)Warning
- Other products and services must equal the sum of its nine parts (v4500_m)Warning
Checks like this one, run at the point of submission, are the first step to real-time supervision.