1 min readWarningEBA reporting framework 4.2Updated 10 November 2026

A calculation check on leverage ratio calculation (C 47.00, row 0300, EBA rule v4460_m)

A warning in the leverage ratio return (COREP LR), on template C 47.00, leverage ratio calculation.

The rule in plain words

Total leverage ratio exposure measure - using a transitional definition of Tier 1 capital times leverage ratio - using a transitional definition of Tier 1 capital must equal tier 1 capital - transitional definition.

All the values are in the amount / ratio column (0010) of C 47.00.

The headline gives only the kind of check and the template, because the rule is too long to say in a headline. The plain words above say all of it.

How the Line4 Check report words itShow

Word for word as the report shows it when the rule fails.

Total Leverage Ratio exposure measure - using a transitional definition of Tier 1 capital × Leverage Ratio - using a transitional definition of Tier 1 capital = Tier 1 capital - transitional definition

What to do if your filing fails it

  1. 01Open the template below and find the cells the rule reads.
  2. 02Work out both sides from your file, as the rule in plain words sets out, and compare them.
  3. 03EBA allows a small rounding difference, worked out from the decimals each value is reported with.
  4. 04It runs only when your filing indicators mark C 47.00 as reported.
  5. 05This is a warning. It does not stop the filing on its own, but your authority may ask you to explain it.

The cells it reads

Leverage ratio calculation (C 47.00)

Rows

  • 0300Total Leverage Ratio exposure measure - using a transitional definition of Tier 1 capital
  • 0320Tier 1 capital - transitional definition
  • 0340Leverage Ratio - using a transitional definition of Tier 1 capital

Column

  • 0010Amount / Ratio
Show the rule as writtenShow

EBA's formula. Cells are written as {template, row, column, sheet}.

{C_47.00,r0300,c0010,} * {C_47.00,r0340,c0010,} = {C_47.00,r0320,c0010,}

Every COREP LR rule, by template

Checks like this one, run at the point of submission, are the first step to real-time supervision.