1 min readWarningEBA reporting framework 4.2Updated 10 November 2026

None of the 16 values it checks in innovative funding structures can be negative (P 02.03, EBA rule v4398_s)

A warning in the funding plans return (FP), on template P 02.03, innovative funding structures.

The rule in plain words

None of the values it checks in innovative funding structures can be negative.

EBA checks it for four columns: actual current position, planned Year 1 Position, planned Year 2 Position and planned Year 3 Position. And for four rows: current debt or debt-like innovative funding structures, innovative funding structures sold to SME, innovative funding structures sold to households, and innovative funding structures sold to households already holding bank deposits. That makes 16 checks. A failure names the one that failed.

How the Line4 Check report words itShow

The first of its checks, word for word as the report shows it when it fails. The others read the same, with their own column, row or sheet.

Planned Year 1 Position: o/w sold to households already holding bank deposits >= 0

What to do if your filing fails it

  1. 01Open the template below and find the cells the rule reads.
  2. 02Look for a value with the wrong sign in these cells, such as an amount entered as a negative number.
  3. 03EBA compares the values exactly here: there is no rounding tolerance.
  4. 04It runs only when your filing indicators mark P 02.03 as reported.
  5. 05This is a warning. It does not stop the filing on its own, but your authority may ask you to explain it.

The cells it reads

Innovative funding structures (P 02.03)

Rows

  • 010Current debt or debt-like innovative funding structures
  • 020o/w sold to SME
  • 030o/w sold to households
  • 040o/w sold to households already holding bank deposits

Columns

  • 010Actual current position
  • 030Planned Year 1 Position
  • 040Planned Year 2 Position
  • 050Planned Year 3 Position

A worked example

The first of its checks, with simple numbers.

What the rule then expects

Innovative funding structures sold to households already holding bank deposits, planned Year 1 Position must then be at least 0.

0Passes
-100Fails

A file that reports 0 passes. One that reports -100 fails, by 100.

The numbers are illustrative.

Show the rule as writtenShow

EBA's formula, as written out for the first of its checks. Cells are written as {template, row, column, sheet}.

{P_02.03,r040,c030,} >= 0

The next five:

{P_02.03,r040,c050,} >= 0{P_02.03,r020,c050,} >= 0{P_02.03,r020,c040,} >= 0{P_02.03,r030,c050,} >= 0{P_02.03,r020,c010,} >= 0

And 10 more, the same formula for the other cells it covers.

Every FP rule, by template

Checks like this one, run at the point of submission, are the first step to real-time supervision.